Syahrial, E., & Berlian, A. (2021). Performance Analysis of the Direct Contact Unit 3 Spray Condenser at PT.X Geothermal Power Plant. Jurnal Teknika Dan Informatika, 1(2), 104-118. https://doi.org/10.52909/jti.v1i1.13